BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//CalBEM - ECPv6.15.17//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:CalBEM
X-ORIGINAL-URL:https://calbem.ibpsa.us
X-WR-CALDESC:Events for CalBEM
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20220313T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20221106T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20230312T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20231105T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20240310T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20241103T090000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20230829T110000
DTEND;TZID=America/Los_Angeles:20230829T120000
DTSTAMP:20260501T235754
CREATED:20230720T171410Z
LAST-MODIFIED:20230818T222303Z
UID:2619-1693306800-1693310400@calbem.ibpsa.us
SUMMARY:Working Group 3 Summer Meeting - CASE Measures & Impact to BEM
DESCRIPTION:Join the CalBEM Working Group 3 (Enhance BEM Capabilities and Metrics) Summer Meeting on August 29th. \n\n\nThis calendar event is just a placeholder. \n\n\nMeeting invitations were sent on 7/20/23. If you have already signed up to receive Working Group 3 updates\, you received an invitation to the event. If you are not already signed up to receive Working Group 3 notifications\, you can sign up here. \n\n\nPlease reach out to us at info@calbem.org if you have any questions or concerns\, if you need the invitation forwarded to you\, or if you would like to join this meeting without signing up for the Working Group. \nMeeting Description:  \nJoin the Working Group 3 Co-Chairs to review and discuss a few CASE measures and their impact on modeling usability\, rulesets\, and the ACM. The Co-Chairs plan to discuss the following measures and more\, time permitting. \n\nNR HVAC Space Heating:\n\nMeasure 1 would result in a mandatory HWST limit of 130°F\, which is below the current ACM Reference Manual setpoint of 160°F.\nAdd a section describing 4-pipe dedicated heat recovery chiller and water-to-water heat pump objects to the ACM reference manual.\nEnhance the thermal energy storage object and ensure it can be configured to provide space heating\, and also reflect different efficiency performance depending on if the TES tank uses ice\, condenser water\, or hot water.\n\n\nMF Domestic Hot Water:\n\nCalifornia Plumbing Code (CPC) Appendix M Pipe Sizing\nPipe Insulation Enhancement\nRequire Balancing Valves\nMaster Mixing Valves\n\n\nMF Restructuring: Envelope\, HVAC\, Other\n\nSlab Perimeter Insulation\nVisible Transmittance\nSkylight Properties (Additions and Alterations)\nCentral Ventilation Shaft Sealing\nAdditions and Alterations Clean-Up\nSnapshot Quality Insulation Installation (QII)\nVerification (HERS/ATT) Clean-Up
URL:https://calbem.ibpsa.us/event/working-group-3-summer-meeting-case-measures-impact-to-bem/
LOCATION:Teams Meeting
ATTACH;FMTTYPE=image/png:https://calbem.ibpsa.us/wp-content/uploads/2022/08/calbem-webinar-header.png
ORGANIZER;CN="CalBEM Working Group 3":MAILTO:info@calbem.org
END:VEVENT
END:VCALENDAR